  1.  Which of the following inaccurately describes a prototype?

    A) A prototype is tangible and allows stakeholders to fine-tune their expectations.
    B) Requirements from a prototype are usually insufficient to move to the design phase.
    C) Prototypes support the concept of progressive elaboration.
    D) A prototype is a working model of the expected product.

    Your answer=, Correct answer= , Work Sheet:

  2.  As a project manager, you are responsible for determining and delivering the required levels of both grade and quality. Select which of the following statements you disagree with.

    A) A product can be of a low quality but high grade.
    B) Low quality and Low grade are always a problem.
    C) A product can be of a high quality but low grade.
    D) Low quality is always a problem but low grade need not always be a problem.

    Your answer=, Correct answer= , Work Sheet:

  3.  In a matrix organization, where the team members report to both, a functional manager as well as a project manager, generally, whose responsibility is it to manage the dual reporting relationship?

    A) Functional manager
    B) HR manager
    C) Team members
    D) Project Manager

    Your answer=, Correct answer= , Work Sheet:

  4.  A control chart should always contain:

    A) Upper and lower warning limits
    B) The cumulative average
    C) Upper and lower control limits
    D) A target value

    Your answer=A, Correct answer= , Work Sheet:

  5.  A ______ is a collection of projects or programs grouped together for strategic business needs.

    A) Portfolio
    B) Management System
    C) Enterprise
    D) Array

    Your answer=A, Correct answer= , Work Sheet: