- Which of these is not a tool or technique for the Administer Procurements process?
A) Contract change control system
B) Recommended Corrective Action
C) Claims administration
D) Performance reporting
Your answer=D,
Correct answer= ,
Work Sheet:
- As a project manager, you are responsible for determining and delivering the required levels of both grade and quality. Select which of the following statements you disagree with.
A) A product can be of a low quality but high grade.
B) Low quality and Low grade are always a problem.
C) A product can be of a high quality but low grade.
D) Low quality is always a problem but low grade need not always be a problem.
Your answer=B,
Correct answer= ,
Work Sheet:
- Which of the following is not a general management technique used to generate different approaches to execute and perform the project work?
A) Lateral thinking
B) Six Thinking Hats
C) Map Out
D) Brainstorming
Your answer=B,
Correct answer= ,
Work Sheet:
- A management control point where scope, budget, actual cost and schedule are integrated and compared to earned value for performance measurement is called a:
A) Code of accounts
B) Control packages
C) Control account
D) Account Plan
Your answer=C,
Correct answer= ,
Work Sheet:
- A hierarchical structure of resources organized by resource type category and resource type used in resource leveling schedules is known as:
A) Team structure
B) Resource Pool
C) Organization breakdown Structure
D) Resource Breakdown Structure
Your answer=D,
Correct answer= ,
Work Sheet: