  3.  As a project manager, you are responsible for determining and delivering the required levels of both grade and quality. Select which of the following statements you disagree with.

    A) A product can be of a low quality but high grade.
    B) Low quality and Low grade are always a problem.
    C) A product can be of a high quality but low grade.
    D) Low quality is always a problem but low grade need not always be a problem.

    Your answer=D, Correct answer= , Work Sheet: